Every customer request looked up in the song database: same name outside brackets and the artist. Click a box to see those requests.
| Song | Artist | Requests | Where to get it |
|---|
Each song list: its rows and songs (the same name by the same artists counts once), the songs repeated within it, how many of its songs we have and don't have, the songs it shares with the other lists, its main 下载来源 and its last import. Show lists those songs; Open goes to the list.
Click "Show" to list these songs.
This month's two parts and the coming festival playlists, against the rules.
| # | Song | Artist | Why | In the database |
|---|
Ours, our supplier and our competitors. "≈" marks an estimate: competitors' song lists can't be retrieved.
Each database's songs at the end of every month, and how many more than the month before. Ours and the supplier's list from their imports; competitors from each month's survey (≈ estimates).
Import the monthly competitor survey (e.g. Competitor Survey - Oct'26.xlsx). Its song counts become the competitors' estimates on the dashboard, and the songs in its charts are checked against our songs and our supplier's list.
No competitor has this chart in the survey.
No competitor has this chart in the survey.
From the survey's ticks: how many of the supplier's newest songs each competitor has. The fewer they have, the better for us.
The songs on the competitors' charts in the latest survey, with customers' open requests for them.
| # | Song | Artist | Asked for | Charting | 语言 | YouTube upload | In the database | Code |
|---|
Asked for: open requests (click to see them), the customers and outlets that asked. Charting: the competitors' charts of the latest survey and the song's rank there. In the database: we have it (release it), a supplier has it (get it from them), or only a competitor has it.
This month's most viewed songs on YouTube, by language, checked against our songs and the song lists.
| # | Video | Views | Views a day | Uploaded | Trending since | 语言 | Countries | Song | Artist | In the database | Code |
|---|
yt-dlp searches YouTube for each language's searches in each of its countries. A video shows while a search found it recently and its views reach the language's minimum. Countries: which country YouTube is told the search comes from (it mostly follows it). Song and artist are read from the video title, so check the match.
No songs match.
Exactly the file's columns, as the supplier sends them: read only here. Import song list… replaces the list with a newer file of the same kind.
Double-click a cell to edit it. Edited cells are marked ●; later imports keep them. Deleting only greys a song out: its code is never given to another song.
No requests match.
Double-click a cell to edit it. "Times" counts every request for the same song and artist; a status is Approved, Pending, Rejected or Released; the app approves a pending request itself (dashed) when we or a supplier already have the song, or when it repeats an earlier request (change its status to reopen it). "In the database" says whether we already have the song, a supplier has it, or only a competitor; click it to open the song in the Database. Importing a newer export adds new requests and updates the status and comment of known ones.
Each person's requests (Assign To: a member or a supplier; a request job assigns them to its lead): how many, where they stand, the release rate, the average time from request to release, and the oldest one still waiting. Click a row for those requests.
| Responsible | Requests | Released | Approved | Pending | Rejected | Release rate | Avg turnaround | Oldest waiting |
|---|
Requests made per month, stacked by outlet.
Each outlet's requests per month, and how many are released.
Grouped by song and artist (ignoring case). Click a row to see its requests.
| # | Song | Artist | Requests | Customers | Released | Pending | Latest |
|---|
Customers type the language themselves, so spellings are grouped (“Korea” and “Korean” are Korean; Malay and Indonesian are one group; Thai, “English/Chinese” and the like are Other). Point at a language to see its spellings; click it to filter.
Past their remove date but not taken down, coming down within 14 days, or waiting for word on when to come down.
The ads showing at each outlet now (and coming up), by memo.
The ads up now, by advertisement type.
Ads put up and taken down per month, the last 12 months.
Each ad is one row of the broadcast memo: the outlets it shows at, the day it goes up, the day it is to come down (REMIND) and the day it was taken down. Importing the memo again updates its ads by their NO and adds new ones; ads added here (no NO) are kept.
Background music: two parts a month (Part 1 plays the 1st–15th, Part 2 the 16th to the end) and the festival playlists. Only new releases (out within the year before it plays) with positive, uplifting or neutral content.
| # | Song | Artist | Language | Released | Content |
|---|
No songs yet: search above to add one, Add by hand…, or copy another playlist's songs.
Released: the date typed in, else the upload date of the first YouTube result for the song and artist, looked up by the server in the background (it may be another upload of the song: type the right date to correct it). Rows in red break a rule. Content: open it to record the song's mood and tick each check; songs keep their checks when copied to another playlist.
| When | User | Module | Action | Details | Result | IP |
|---|
The version each outlet runs now, from the updates recorded. Outlets can be on different versions.
| Outlet | Version now | Installed | Before | Updates |
|---|
No outlets yet: they come from the song requests, or Record update… with a new outlet's name.
Outlets are those the song requests name, plus any recorded here. Pick a version under Version now to record that the outlet got it today, or Record update… for several outlets at once (or another day); History shows an outlet's updates, and takes back one recorded by mistake. Colours go by age: the latest version green, then lime, yellow and orange, the oldest red. Installed: pick another day to correct it.
Every version of the app: the day it was released and what changed, and how many outlets run it now.
| Version | Released | What changed | Outlets running it | Note | Recorded |
|---|
No APK version recorded yet: New APK version.
Each area of the site has its fixed job template. This month: the changes made there (from the Log) and by whom, and its jobs. Open goes to the area; Jobs lists its jobs.
One card per person: their open jobs (and how many are late or due within 7 days), what they finished this month, their song requests, and what they are working on. Jobs ›: their jobs.
Jobs that are late or due in the next 7 days, the earliest estimated finish first. Click one to open it.
| Estimated finish | Job | Who | Progress |
|---|
The kinds of work with a monthly target: items in the jobs finished this month against it (the mark: what is required). Set targets in Job templates….
Each month's items done against target, for the kinds of work that have one.
Customers' requests that came in each month and the requests released that month (with a known release date: those already released when first imported are left out).
Items done per month, by kind of work.
Who entered our new songs (imported the platform file, or added them), month by month: the month picked and the five before it.
This month's new songs by who made them (Made by: a song production job's lead).
This month's new songs by their song version.
The songs platform imports added each month, by QC result. Produced = a maker and QC passed (what the production KPI counts). Click a number to list those songs in Our decrypted song list.
| Month | New | Produced | QC passed | QC failed | Not checked | Not assigned | Request | New trending | Other |
|---|
| Member | Made in the month | Produced in the month | Made, every month |
|---|
| Code | 歌名 | 歌星 | 语言 | Added | Made by | QC |
|---|
Every piece of work is a job: New job, pick the kind of work, who, how many, its start and estimated finish, and the jobs it comes after. Each job is a bar from its start to its estimated finish, filled as far as its progress; drag it to move it, drag its ends to change the dates, drag ◆ to set its progress, and drag ● onto another job for that one to come after it (click an arrow to take it away). Moving a job later moves the jobs after it. A job is done when it gets its finish date (open it: Finished today): a song production job then gives its songs their maker and QC passed, a song request job releases its requests. A job not finished in an earlier month comes along into the next. Weekly and monthly work gets its job by itself.